Loading dock in Detroit. Forklift traffic Monday. We poured Friday night, opened Sunday 6pm.
-
900 sqft garage, silver over charcoal. Degreased twice. No fish-eyes. Customer paid in 14 days.
-
North Vancouver garage. Rain for three days. Held the pour. Customer was mad until the floor came out clean.
-
Denver metallic, 700 sqft. Material flashed faster than the TDS. Next time I mix smaller batches.
-
Full flake, 650 sqft, Garden Grove. Broadcast to refusal, scrape, second broadcast, then topcoat window held.
-
Food plant shutdown, Chicago. 9,000 sqft, quartz in the washdown. Three days. They ran production Thursday.
-
Finished a 2-car in San Antonio. Brother ran the sander, I mixed. 6 hours slab to topcoat.
-
July garage in Phoenix. Slab was 94°F at 10am. Rescheduled to 5:30am next day. Floor locked in clean.
-
Atlanta 3-car, full flake. Shot-blast, not acid. Bid showed prep as its own line. Customer signed the same day.
-
Baton Rouge, dew point was 4 degrees off. Packed up. Came back at 6am. Floor came out right.